By Robie Evans, Director of Operations We have exciting news! The “River of Life” footpath installation in our Memorial Garden will begin this June, 2021, according to Designer and Artist Jerry Thiebolt. A couple of years ago, we held three brick-stamping events at both campuses to create the “building blocks” of this footpath while leaving a little of our creativity behind as a part of this beautiful garden of six memorial walls. Over 80 congregants of all ages participated in this artistic endeavor and we are excited to see this footpath come into being. Our Memorial Garden had been a goal of the Church since our current Memorial Wall became fully subscribed. Our garden walls will be inscribed with over 1,000 names of deceased church members in a manner similar to what our current Memorial Wall accomplishes while offering a quiet, open area for contemplation, reflection, and meditation. Esthetically, our Garden complements our Patio and offers windows onto the canyon below. All of this has been accomplished in a design that reflects our vision and mission of our church and our community. The Garden walls’ recurring theme will be the “River of Life,” with meaningful poetry, symbols and quotes relative to our faith and our lives. The art (clay work) on the walls will be done over several years’ time. “The River of Life flows to the eternal sea,” says Jerry. “We’re here for seconds and this is a perfect analogy. It’s always moving; it keeps flowing - we can never stop it.” Construction on Wall #1 of our Garden will take approximately one year and will hopefully begin soon after the River of Life footpath is completed. There are a couple of obstacles to overcome first: the specific clay that Jerry uses is no longer available from his clay vendors, and, Jerry is on the lookout for an apprentice in this highly-specialized field; someone who has both engineering and artistic skills. Watch for updates in upcoming issues of the Window. All questions should be directed to Robie Evans, Director of Operations, at 619-398-4433 or [email protected].
1 Comment
3/11/2021 07:07:45 pm
Soooooo, does this mean that we are committed to staying here at 4190 Front Street, and NOT selling our land to UCSD?
Reply
Your comment will be posted after it is approved.
Leave a Reply. |
What's New?The First UU Church of San Diego blog is your resource for upcoming events and past event recaps. Leave us a comment to let us know what you think!
Categories
All
Archives
September 2024
|